Orleans Conservation Commission
Hearing Meeting Nauset Room October 15, 2013
8:30 a.m. Call to Order
Continuations
Last Heard 10/1/13
Carol Nace 75 Viking Road
by East Cape Engineering, Inc. Assessor’s Map 70, Parcel 31. The proposed removal & reconstruction of an existing licensed pier & seasonal float. Work will occur on a Salt Marsh, in Land Under Water, in Land Subject to Coastal Storm Flowage, & in the Pleasant Bay A.C.E.C.
Notice of Intent
Jean & Thomas Russell 74 & 75 Viking Road
by East Cape Engineering, Inc. Assessor’s Map 63, Parcel 54, & Assessor’s Map 70, Parcel 31. The proposed nourishment and stabilization of a Coastal Bank. Work will occur on a Coastal Bank, Coastal Beach, Land Subject to Coastal Storm Flowage, & in the Pleasant Bay A.C.E.C.
Nicholas Mazzarese 80 Tom’s Hollow Lane
by Ryder & Wilcox, Inc. Assessor’s Map 89, Parcel 5. The proposed replacement of an existing wooden stairway & landscaping. Work will occur within 100’ of a Coastal Beach, & Coastal Bank, & on a Coastal Bank, Coastal Beach, Land Subject to Coastal Storm Flowage, & in the Pleasant Bay A.C.E.C.
William Gaughan 40 Winslow Drive
by JC Ellis Design, Inc. Assessor’s Map 91, Parcel 44. The proposed upgrading of an existing septic system including the pumping & abandonment of the existing system. Work will occur within 100’ of the Edge of a Bordering Vegetated Wetland, Uncle Seth’s Pond, & the Pleasant Bay A.C.E.C.
Michael & Patricia Schumaecker 161 Monument Road
by JC Ellis Design, Inc. Assessor’s Map 55, Parcel 58. The proposed expansion of an existing deck. Work will occur within 100’ of a Bordering Vegetated Wetland, Coastal Bank, & Pilgrim Lake.
Elizabeth Ann Sanders Irrevocable Trust of
April 9, 1999, & Charles A. Sanders 3 South Little Bay Road
by East Cape Engineering, Inc. Assessor’s Map 82, Parcel 6. The proposed stabilization of a Coastal Bank. Work will occur on a Coastal Bank, Land Subject to Coastal Storm Flowage, & the Pleasant Bay A.C.E.C.
John F. McCoy 20-23 Preservation Path
by Ryder & Wilcox, Inc. Assessor’s Map 24, Parcels 100 & 104. The proposed upgrading of an existing septic system including the pumping & abandonment of an existing leaching field, & the installation of a new septic system to serve an existing single-family dwelling. Work will occur within 100’ of a Salt Marsh, Coastal Bank, & Land Subject to Coastal Storm Flowage.
Chairman’s Business
Approval of the Minutes from the Meeting on October 8, 2013
Other Member’s Business
Administrator’s Business
The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting. Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.
|